01
7 Jan 2019
The Aizhai Bridge adopts a unique artistic form of the main structure. The pylons and stiffened steel girder built on both sides of the mountain are directly connected with the tunnel on the cliff. The tunnel anchors and gravity anchors designed according to the geological and topographic conditions are very harmonious with the beautiful natural landscape around. At the same time, the top of the bridge tower adopts the ox head pattern, which is the idol and mascot of the local people, symbolizing the humility and kindness of the people, strong and progressive. The horn-shaped bridge tower of the two mountains is integrated with the stretched arc suspension cable to form the local landmark building.

01
7 Jan 2019
Port Qasim Lanmu Power Station is a key project of the China-Pakistan Economic Corridor, and is also the first large-scale energy project invested by China Power Construction Group and Qatar AL-MIRQAB, with an installed capacity of 1.32 million kilowatts.

01
7 Jan 2019
Since Baihetan Hydropower Station was put into operation, all functions have reached the design target, all performance indexes of the hub building are better than the design value, and the unit runs stably and efficiently. In October 2023, the cumulative power generation exceeded 100 billion KWH.

01
7 Jan 2019
Beijing Daxing International Airport project has created more than 40 international and domestic first, 103 technical patents, 65 new construction methods, the localization rate of more than 98%, thousands of construction units, more than 50,000 people work at the same time during the construction peak.

01
7 Jan 2019
The Sichuan section of the highway is led by Sichuan Railway Investment Group, with a total length of about 41 kilometers and a total investment of about 7.024 billion yuan. The project starts in Renhe Town, Renhe District, Panzhihua City, and ends in Taiping Township, Renhe District, Panzhihua City, including the main line and the branch line of Li (Jiang) Pan (Zhihua) Expressway. The whole line adopts four-lane expressway standard construction, with a design speed of 80 km/h.

01
7 Jan 2019
Dubai Hassan Power Plant is a key project in the energy strategic plan of the Dubai government. The coal-burning project in the Middle East is also a key project of China's "Belt and Road" initiative. It consists of four 600MW units.

01
7 Jan 2019
It is a bridge and tunnel project connecting Hong Kong, Guangdong, Zhuhai and Macau in China. The Liandingyang water area at the mouth of the Pearl River in Guangdong Province, China, is the ring road of the southern section of the highway in the Pearl River Delta region.

01
7 Jan 2019
A high-speed railway connecting Jinan and Qingdao in China's Shandong province, running east-west, is the end of the Qingyin passage on the eastern section of China's "eight vertical and eight horizontal" high-speed rail network.

01
7 Jan 2019
Beijing-new Expressway, from Beijing to Urumqi, is the largest single highway construction project in Asia, and is also an important traffic artery for the development of the western part of the country. With a total length of 930 kilometers, it passes through Badain Jaran Desert, Tengger Desert and Ulan Buhe Desert, making it the longest desert highway in the world.

01
7 Jan 2019
Longtan Hydropower Station, located in the upper reaches of Hongshui River in Guangxi, is part of the main stream of the Pearl River. Longtan Hydropower Station is a landmark project of "west-east power transmission" and a key project of the western development. Construction of the power station began in 2001 and was completed by the end of 2009. The design water level is 400 meters, the dam is 216.5 meters high, the dam top length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation is 18.7 billion KWH.

01
7 Jan 2019
The Three Gorges Dam, located in Yichang, Hubei Province, is the world's largest hydropower project and clean energy base. The total length of the Three Gorges Dam is about 3335 meters, the dam is 185 meters high, the total concrete volume is 16.1 million cubic meters, the water storage elevation is 175 meters, the total investment of 95.5 billion yuan, the installation of 32 hydropower units with a capacity of 700,000 kilowatts, the installed capacity of 22.4 million kilowatts

01
7 Jan 2019
The automated terminal phase IV of the deep-water port was officially opened. This "unmanned terminal" is the largest and most fully automated container terminal in the world.

01
7 Jan 2019
It is an important hub of Shen-Hai Expressway (G15), a national expressway across the Yangtze River, and an important part of Ganyu - Haojiang Expressway, the "vertical No. 1" of Jiangsu's main highway network, and the largest bridge construction project in the history of China at that time. The most complex construction conditions of the ultra-large bridge project.

01
7 Jan 2019
Taihang Mountain Tunnel, the third longest tunnel in China, is a double-hole single-line tunnel, the maximum buried depth of 445 meters, the distance between the two lines is 35 meters, the total length of the down line is 27,839 meters, the total length of the up line is 27,848 meters.

01
7 Jan 2019
Wuhan Huoshenshan Hospital is located in Zhiyinhu Avenue, Caidian District, Wuhan. Following the model of "Beijing XiaoTangshan Hospital" during the fight against SARS in 2003, a special hospital has been built in the staff nursing home of Wuhan to treat and treat patients with novel coronavirus pneumonia. Behind the construction of Huoshenshan Hospital, hundreds of millions of people fought side by side.

01
7 Jan 2019
Xiluodu Hydropower Station, located on the Jinsha River at the border of Sichuan Province and Yunnan Province, is the backbone project of the national "West-east power transmission" and the largest hydropower station on the Jinsha River. The project is mainly for power generation, and has comprehensive benefits such as flood control, sand containment and improvement of upstream shipping conditions, and can provide cascade compensation for downstream power stations.

01
7 Jan 2019
Guangxi Fangchenggang Nuclear Power plant plans to build 6 million kilowatts of nuclear power units, the first phase of the project using China's improved pressurized water reactor nuclear power technology CPR1000, the new two single-unit capacity of 1.08 million kilowatts of pressurized water reactor nuclear power units. The localization rate of equipment is as high as 80%.