Wholesale Mild Carbon Steel Galvanized Pipe Erw Hot Dipped Galvanized Pipe cycle carbon steel frame mountain bike mtb bicycle
Other attributes
Place of Origin
|
Shandong, China
|
Alloy Or Not
|
Non-Alloy
|
Standard
|
EN
|
Technique
|
SMAW
|
|
|
Grade
|
10#.20#.45#15Mn.20Mn.45Mn.30Mn2
|
Delivery Time
|
8-14 days
|
Application
|
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe
|
Special Pipe
|
Other
|
Thickness
|
10-100MM
|
Length
|
12M, 6m, 6.4M
|
Certificate
|
API, Bsi, rohs, SNI, BIS, SASO, PVOC, SONCAP, SABS, sirm, tisi, JIS, GS, ISO9001
|
Processing Service
|
Welding, Punching, Cutting, Bending, Decoiling
|
Product name
|
Seamless Carbon Steel Pipe
|
Material
|
Seamless Steel
|
Type
|
Seamless Round Steel Pipe
|
Keyword
|
carbon steel seamless pipe
|
Usage
|
Construction Structure
|
Shape
|
Round Pipe Tube
|
Technique
|
Cold Rolled Hot Rolled Galvanized
|
Packing
|
STANDARD PACKING
|
MOQ
|
5 Tons
|
Steel Grade
|
ASTM A53/A106
|
Packaging and delivery
port |
Tianjin, Qingdao |
Lead time
Quantity (metric tons) |
1 - 28 |
29 - 50 |
51 - 100 |
> 100 |
Lead time (days) |
7 |
15 |
25 |
To be negotiated |
Customization
Product Overview

Carbon steel pipes are made of steel ingots or solid round steel perforated into capillary tubes, which are then hot rolled, cold rolled or cold drawn.





Specification
Product Name |
Seamless Carbon steel pipe |
Keywords |
Seamless steel pipe |
Standard |
API, ASTM, BS, DIN, GB, JIS |
Outside Diameter |
4mm - 914.4mm; 8mm-630mm |
Wall Thickness |
1-50mm |
Dia Tolerance |
Control with in the standard, OD:+-1%, WT:+-1% |
|
10#,20#,45#,Q235,Q345,Q195,Q215,Q345C,Q345A |
ASTM A53A/A53B/ A178C/A106B API5L | |
ST37,ST37-2,DIN 1629 ST35, ST45,DIN 17175 ST35.8,DIN 17175 19Mn5 | |
16Mn,Q345B,T1,T2,T5,T9,T11,T12,T22,T91,T92,P1,P2,P5,P9,P11,P12,P22,P91,P92,15CrMO,Cr5Mo,10CrMo910 | |
Gr.B,X42,X46,X52,X60,X65,X70,X80,X100 | |
Inspection |
ISO,BV,SGS,MTC |
Packing |
Steel strip packed. Standard Export Seaworthy Package.Suit forall kinds of transport,or as required |
|
Widely used in Structure, Accessorize,Construction, |
MOQ |
5 ton,sample order accepted |
Shipment time |
Within 7-10 workdays after receiving deposit or L/C |


Our company has long-term strategic cooperative relationships with international shipping companies such as MSC, MAERSK, CMA CGM, COSCO, and international express companies such as DHL, FedEx, and UPS, ensuring the safety and timeliness of cargo transportation.
Team style
Now there are different departments, each performing their own duties. There are a total of 36 international trade teams, dedicated to connecting agents, trading companies and direct users in major regions around the world. There are 25 technicians and more than 70 workers, and the annual output can reach 100,000 tons.






Company Profile

